Kitchen remodeling in Henderson, NV from Boutique Builders gives you one licensed contractor (Nevada license 0092223) for design, permits, cabinets and countertops. We have remodeled Henderson kitchens since 2017, hold an A+ BBB rating and give free written estimates.
★ 5.0 ON GOOGLE · A+ BBB · NV LIC. 0092223 · OPEN 24/7SEE PRICES, WHAT YOU GET AND FAQS
Boutique Builders Las Vegas is a licensed Nevada general contractor (NV License 0092223) with an A+ BBB rating, and kitchen remodeling in Henderson is one of the projects we are asked about most. From Green Valley and Anthem to Seven Hills, Inspirada and Lake Las Vegas, we redesign kitchens with new cabinets, quartz and natural stone countertops, islands, tile, lighting and flooring, with one project manager from the first visit to the final walkthrough.
Many Henderson homes in Green Valley and Whitney Ranch were built in the 1990s and early 2000s with closed kitchens, oak cabinets and tile counters. Newer homes in Inspirada, Cadence and Anthem often have good layouts but builder grade finishes. We start by looking at what your kitchen already does well, then plan the changes that add the most function and value: better storage, a larger island, brighter lighting and durable surfaces that hold up to daily cooking and the desert heat.
Kitchen remodels that move plumbing, gas or electrical, or remove walls, need a permit from the City of Henderson. We prepare the plans, pull the permit and schedule every inspection, so the work is done to code and documented when you sell. Interior kitchen work usually does not need HOA review, but if your project changes exterior walls, windows or vents, we help you submit the request to your Henderson HOA before work starts.
| Remodel level | What is included | Typical cost | Timeline |
|---|---|---|---|
| Cosmetic refresh | New countertops, backsplash, paint or reface cabinets, hardware, fixtures | $8,000 to $18,000 | 2 to 3 weeks |
| Full remodel, same layout | New cabinets, quartz counters, flooring, lighting, backsplash, appliances | $25,000 to $55,000 | 6 to 10 weeks |
| Layout change | Move walls, add an island, relocate plumbing or gas, new electrical | $55,000 to $100,000+ | 8 to 12 weeks |
For a full item by item breakdown, read our Las Vegas kitchen remodel cost guide, or see all of our kitchen remodeling services in Las Vegas.
Green Valley, Green Valley Ranch, Anthem, Seven Hills, MacDonald Highlands, Inspirada, Cadence, Whitney Ranch, Lake Las Vegas, Silverado Ranch and the rest of Henderson, plus nearby Henderson general contracting projects.
If you move plumbing, gas or electrical, or remove a wall, yes. A cosmetic update such as new counters and backsplash usually does not. We tell you which applies during the estimate and handle the City of Henderson permit for you.
A cosmetic refresh takes about 2 to 3 weeks, a full remodel with the same layout about 6 to 10 weeks, and a layout change about 8 to 12 weeks, depending on materials and permits.
Most Henderson homeowners do. We protect floors and close off the work area, and we help you plan a temporary kitchen setup for the weeks the kitchen is out of service.
Planning a kitchen remodel in Henderson?
Get a free on site estimate and a fixed written price from a licensed Nevada contractor.
Call (702) 996-4388Request an Estimate