Quick answer: home remodel cost in Las Vegas (2026)
| Single room remodel | $15,000 to $45,000 |
| Mid range whole house update | $45,000 to $120,000 |
| High end whole house remodel | $120,000 to $250,000+ |
Typical Las Vegas ranges, updated October 2026. Exact pricing comes from a free on site estimate: call (702) 996-4388 or see our home remodeling page.
Those three numbers are the honest short version. The rest of this page explains where your project will land inside those ranges, using the same price ranges we quote every week in Las Vegas, Henderson, Summerlin and North Las Vegas.
What one room costs to remodel in Las Vegas
Most homeowners do not remodel the whole house at once. They start with the room that bothers them most. These are the typical Las Vegas ranges we see:
- Kitchen refresh (new countertops, backsplash, paint or refaced cabinets): $15,000 to $30,000.
- Full kitchen remodel in the same layout with new cabinets and appliances: $35,000 to $65,000.
- Kitchen with layout changes (moving walls, plumbing or the gas line): $70,000 to $120,000 or more.
- Hall bathroom remodel: $12,000 to $25,000.
- Tub to walk in shower conversion: $15,000 to $32,000.
- Full bathroom remodel: $22,000 to $45,000.
- Primary bathroom: $35,000 to $75,000 or more.
Full breakdowns are in our kitchen remodel cost guide and bathroom remodel cost guide.
What a whole house remodel looks like in real numbers
Take a typical 1990s single story home in Las Vegas, around 1,800 square feet, with the original kitchen and two original bathrooms. A common plan is a full kitchen remodel in the same layout plus both bathrooms. Using the ranges above, that combination usually lands between about $60,000 and $115,000 before flooring and paint. Add new flooring and interior paint through the house and you are in the mid range whole house bracket.
Move walls, open the kitchen to the living room, relocate plumbing, or choose custom cabinetry and natural stone throughout, and you move into the high end bracket of $120,000 to $250,000 or more.
Five things that push a Las Vegas remodel up or down
1. Moving plumbing in a slab foundation
Almost every house in the valley sits on a concrete slab. Keeping the sink, toilet and shower where they are is the single biggest way to control cost. Moving a drain means cutting and trenching the slab, re plumbing and patching concrete, and it usually means a plumbing permit.
2. The age of the house
Homes built in the 1980s and 1990s often hide surprises once walls and floors open up: older supply lines, undersized electrical panels, or water damage behind a shower that leaked for years. We price a contingency for this in older homes instead of pretending it will not happen.
3. Permits and HOA approval
Cabinets, countertops, flooring and paint usually do not need a permit. Moving walls, plumbing, gas or electrical does. Depending on your address, the permit comes from the City of Las Vegas, Henderson, North Las Vegas or Clark County. Many neighborhoods also need HOA approval for exterior changes, windows or work hours. See our kitchen permit guide and bathroom permit guide.
4. Finish level
Two kitchens with the same layout can be $30,000 apart because of cabinet construction, countertop material and appliances. Cabinets and countertops are usually about half of a kitchen budget, so that is where the decision matters most.
5. Living in the house during the work
Staying home is possible for most projects, but it means doing the work in phases, keeping a bathroom and a way to cook available, and more daily cleanup. That can add time. Moving out for the noisiest weeks is often faster.
Where to spend and where to save
- Spend on waterproofing behind showers, proper ventilation, and anything inside the walls. These are the things you cannot fix later without tearing out new finishes.
- Spend on fixtures and glass that hold up to Las Vegas hard water.
- Save by keeping the layout, choosing quality semi custom cabinets instead of full custom, and using a durable porcelain tile instead of natural stone in secondary bathrooms.
- Save by doing all the rooms that need the same trades in one project instead of three separate ones.
How long a home remodel takes
A single room usually takes 3 to 8 weeks of work once materials are on site. A whole house remodel usually takes 2 to 6 months, depending on scope, permits and material lead times. Semi custom cabinets alone can take 4 to 6 weeks to arrive, so we order early.
How we price your remodel
We walk the house, measure, and talk through what you want to change and what you want to spend. Then you get a written estimate with every line item and a milestone payment schedule tied to finished work, not to dates. Boutique Builders Las Vegas is a licensed Nevada general contractor (NV License 0092223), and one project manager runs your job from first visit to final walkthrough.
Common questions
Is $50,000 enough to renovate a house in Las Vegas?
It is enough for one full kitchen remodel in the same layout, or two bathroom remodels, or a refresh of the kitchen plus flooring and paint. It is usually not enough for a whole house remodel with layout changes.
Is it cheaper to remodel or buy a different house?
If you like your neighborhood and your lot, remodeling usually costs less than selling, paying closing costs and moving. If the house needs everything at once, including roof, layout and systems, compare both options with real numbers before deciding.
Should I remodel in phases?
Phasing works well when you plan the order: anything that involves plumbing, electrical or walls should come first, and flooring that runs through several rooms should go in once. Phasing badly usually costs more in the end.
Want a real number for your house? Call (702) 996-4388 or request a free estimate. You can also see our home remodeling services in Las Vegas.