Short answer: plan a kitchen remodel in this order: set your budget, decide whether the layout stays or changes, pick cabinets and countertops first (they are about half the budget and have the longest lead times), confirm permits, then plan how you will live without a kitchen for a few weeks. Most full kitchen remodels in Las Vegas take 4 to 8 weeks once materials are on site.
1. Set a realistic budget
Typical Las Vegas ranges: $15,000 to $30,000 for a refresh (countertops, backsplash, paint or refaced cabinets), $35,000 to $65,000 for a full remodel in the same layout with new cabinets and appliances, and $70,000 to $120,000 or more when walls, plumbing or the gas line move. Keep about 10 percent aside for surprises, especially in older homes. See our kitchen remodel cost guide.
2. Decide: same layout or new layout?
This is the biggest cost decision. Keeping the sink, range and refrigerator where they are avoids cutting the slab for new drains, rerouting gas and adding circuits. Opening a wall to the living room or adding an island with a sink changes the budget bracket.
3. Measure how you actually use the kitchen
- Where do you prep, and where do things pile up?
- What do you not have room for today: trash and recycling pull out, pantry, baking sheets, small appliances?
- How many people cook at once, and where do guests stand?
Write the answers down before talking to a designer or contractor. They decide the cabinet layout.
4. Choose cabinets first
Cabinets and countertops are usually about half of the budget. Decide between refacing, stock, semi custom and custom early, because semi custom cabinets often take 4 to 6 weeks to arrive. Soft close hardware, full extension drawers and a pull out trash are worth including at any budget.
5. Pick countertops that suit Las Vegas
Quartz is the most popular choice here: low maintenance and resistant to hard water spots. Granite works well too but needs sealing. Countertops are templated after the base cabinets are installed, so they come later in the schedule.
6. Plan lighting and outlets
Under cabinet lighting, recessed lights and enough outlets along the counters make the biggest daily difference. New circuits usually need a permit, so plan them up front.
7. Check permits and HOA rules
Cabinets, countertops, backsplash, flooring and paint usually do not need a permit. Moving plumbing, gas, walls or adding circuits does. See our kitchen permit guide. Some HOAs and condo boards also limit work hours and require approval.
8. Order long lead items early
Cabinets, appliances, specialty tile and custom glass can delay a project if ordered late. Approve the design, then order everything before demolition starts.
9. Plan to live without a kitchen
Set up a temporary kitchen with the refrigerator, microwave and a coffee maker in another room. Expect several weeks without a working sink and stove.
10. Hire one accountable contractor
Get a written, line by line estimate, a schedule, and milestone payments tied to finished work. A licensed general contractor coordinates every trade and pulls the permits.
Common questions
How long does it take to plan a kitchen remodel?
Design and selections usually take a few weeks, then cabinet lead time. Planning well before demolition is what keeps the project on schedule.
What should I buy first for a kitchen remodel?
Cabinets and appliances, because the layout and countertop template depend on them.
Should I remodel the kitchen or the bathrooms first?
If you are doing both, doing them in one project saves on mobilization and shared trades. If you choose one, most homeowners start with the room they use most.